This report presents a methodology for allocating loss and damage costs to various elements of the railroad transport cycle. Estimates of loss and damage attributed to linehaul shock and vibration and flat and hump yard coupling impacts are provided. In addition, loss and damage estimates are provided for various levels of overspeed impacts in hump yards. The methodology is also extended to allocate coupler damage to train-slack action and yard coupling impacts.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Allocating Loss and Damage to the Railroad Transport Cycle


    Beteiligte:
    P. J. Wong (Autor:in)

    Erscheinungsdatum :

    1981


    Format / Umfang :

    74 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Railroad vehicle derailment damage prevention device

    CHO BYUNG JIN / JEON JIN PYO / KIM GEO YOUNG et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Transport and railroad gazette

    TIBKAT | [N.S.] 1=37.1904 - 2=38.1905


    Railroad traffic and the business cycle

    Vanderblue, H.B. | Engineering Index Backfile | 1924


    Freight transport on Pennsylvania railroad

    Buchler, W. | Engineering Index Backfile | 1939