The operational activities at the RAE Satellite Control Centre on the mornings of 10 March and 21 May 1974 when the Miranda satellite was in an 'electronically disturbed' state are described. The controller returned the satellite to its planned state using automatic techniques within the timescale of each pass and thus prevented possible mission failure. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Miranda: Operations for Two 'Electronically Disturbed' Passes


    Beteiligte:
    M. J. Hammond (Autor:in) / E. A. R. Anstey (Autor:in) / E. Jones (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    44 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Disruption and Reaccumulation of Miranda

    Marzari, F. / Vanzani, V. / Weidenschilling, S. et al. | British Library Conference Proceedings | 1995


    The Miranda Star Sensor Experiment

    G. W. Brown / P. Haskell / B. Hollaway | NTIS | 1978


    Real Time Operational Control of Miranda

    E. A. R. Anstey / M. J. Hammond | NTIS | 1976


    Lanzamiento del buque planero "Capitan Miranda"

    Crespo, R. | Engineering Index Backfile | 1930


    Reorientation of Mini-Moons: Enceladus and Miranda

    Pappalardo, Robert T. / Nimmo, Francis / Moore, Jeff | NTRS | 2006