The Army Preliminary Evaluation of the OH-58A prototype helicopter was conducted in the vicinity of Arlington, Texas, during the period 26 June to 9 July 1969. Thirteen test flights were conducted for a total of 14.5 hours of which 9.1 hours were productive. The evaluation consisted of limited quantitative and qualitative stability and control tests in the armed scout configuration only. The handling qualities of the OH-58A are satisfactory for the accomplishment of the armed scout mission. (Author)
Army Preliminary Evaluation, Prototype OH-58A Helicopter with XM27E1 Weapon Subsystem
1970
59 pages
Report
Keine Angabe
Englisch
Aircraft , Fire Control & Bombing Systems , Helicopters , Stabilized platforms , Flight testing , Firing tests(Ordnance) , Stability , Aerial gunnery , Helicopter rotors , Flight instruments , Instrument panels , Hovering , Man machine systems , Acceptability , Wind , Low altitude , Flight paths , Army aircraft , Observation aircraft , Performance(Engineering) , 7.62-mm guns , Gau-2b/a guns , H-58 aircraft , Oh-58a aircraft , Qualification tests
Preliminary Flight Prototype Waste Collection Subsystem
NTIS | 1974
|Preliminary flight prototype waste collection subsystem
NTRS | 1974
|