The project proposes construction of additions to BPA's electric transmission system including transmission lines, substations, and related structures; maintenance of existing facilities including repair of equipment, structures, aerial conductors, and access roads; and control of trees and brush on transmission line rights-of-way. States involved include Washington, Oregon, Idaho, Wyoming, and Montana. A summary of environmental impact and adverse environmental effects is given.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Proposed Fiscal Year 1974 Program, Bonneville Power Administration


    Erscheinungsdatum :

    1973


    Format / Umfang :

    370 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Bonneville Power Administration Timing System

    Martin, K. E. / United States; National Aeronautics and Space Administration | British Library Conference Proceedings | 1995




    Bonneville dam

    Gorlinski, J.S. | Engineering Index Backfile | 1935