Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.
Lageos Assembly Operation Plan
1975
41 pages
Report
Keine Angabe
Englisch
Lageos assembly operation plan
NTRS | 1975
|NTRS | 1976
|NTRS | 1975
|AIAA | 1993
|Some Comparisons of Orbit Determination and Parameter Estimation Based on LAGEOS 1 and LAGEOS 2 Data
British Library Conference Proceedings | 1995
|