The report documents the results of the traffic data collection efforts during May 1992, two years after reconstruction began on the US-75 North Central Expressway south of the I635 LBJ Freeway. Traffic conditions and patterns have been monitored during October 1989 and May 1990 (before construction) and during October 1990, May 1991, October 1991, and May 1992 (during the first two years of the project). The traffic monitoring efforts included traffic data collection and automobile and transit user surveys. The traffic data collection efforts included screen line traffic volume counts, vehicle occupancy and classification counts, and travel time runs. The automobile and transit users surveys are documented in a separate report. The results indicate that the reconstruction activities underway during the May 1992 data collection efforts had little impact on peak period, peak direction traffic conditions and patterns in the corridor. Some minor changes were observed in the daily traffic patterns throughout the corridor.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    US-75 North Central Expressway Reconstruction: May 1992 Traffic Conditions


    Beteiligte:
    K. D. Tyer (Autor:in) / R. A. Krammes (Autor:in)

    Erscheinungsdatum :

    1993


    Format / Umfang :

    135 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch