The proposed action is to develop five miles of pedestrian and bike trails on the east side of Highway 550 at Ridgway State Park. The new trails would be located on Bureau of Reclamation (Reclamation) land managed by Colorado Division of Parks and Wildlife (CPW) as Ridgway State Park (RSP) in Ouray County. There are no authorized bike trails in this area and bikes are currently limited to existing designated park roads. The new trails would also compliment an adjacent Bureau of Land Management (BLM) project, with three miles of trails connecting with proposed BLM trails, resulting in a combined 20 miles of new trails. A seasonal closure between December 1st and April 301 h on the newly constructed trail system is proposed to protect concentrations of wintering big game. This Environmental Assessment (EA) is prepared in accordance with the National Environmental Policy Act, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions ofNEPA (40 CFR 1500-1508), and the U.S. Department of the Interior's regulations (43 CFR Part 46).


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Dallas Creek Eastside Trails Project Final Environmental Assessment Western Colorado Area Office Upper Colorado Region


    Erscheinungsdatum :

    2014


    Format / Umfang :

    24 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Colorado Maglev Project, Final report

    V. Anisimow / J. R. Wilson / W. C. Womack et al. | NTIS | 2004


    Hidden Piping - Willow Creek Dam, Clark Colorado

    Hodges, M. D. / Wacha, B. / Association of State Dam Safety Officials | British Library Conference Proceedings | 1997


    Colorado big Thompson project

    Engineering Index Backfile | 1957



    Colorado. Keeping colorado highways open

    Engineering Index Backfile | 1928