This report presents the results of a six month study of test service and overhaul experience on the transmission system components of H-3, H-53, and H-54 helicopters. The study was conducted to determine the relative effectiveness of bench, tie-down and flight testing in revealing transmission system modes of malfunction or failure. Failure data for transmissions of all three aircraft were made to determine failure trends and rates of failure. An analysis of these data, overhaul information and component costs was conducted to determine the effectiveness of current overhaul practices and recommendations for transmission operating intervals are offered. An investigation of the relative costs spent on testing, production and spare transmission overhaul, and modifications (ECP's) has been made for the H-3 and H-53 which underwent full military qualification test programs. A discussion of the goals of transmission development is included along with a suggested transmission test program. (Author)
Study of Helicopter Transmission System Development Testing
1968
92 pages
Report
Keine Angabe
Englisch
Helicopter transmission testing
Tema Archiv | 1981
|Development of Helicopter Power Transmission System Technology
Trans Tech Publications | 2011
|Development of an Advanced Helicopter Transmission
Online Contents | 1996