The NASA Engineering and Safety Center (NESC) was requested to support the Arecibo Observatory failure investigation in determining the root cause of the Auxiliary M4N cable failure. The NESC and Kennedy Space Center led an integrated NASA investigation with support from Marshall Space Flight Center and The Aerospace Corporation that included forensic investigation of failed hardware, finite element modeling, materials characterization, and root cause analysis. This document contains the outcome of the NESC Assessment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Arecibo Observatory Auxiliary M4N Socket Termination Failure Investigation


    Beteiligte:
    G. Harrigan (Autor:in) / A. Valinia (Autor:in) / N. Trepal (Autor:in) / P. Babuska (Autor:in) / V. Goyal (Autor:in)

    Erscheinungsdatum :

    2021


    Format / Umfang :

    640 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Arecibo Observatory Auxiliary M4N Socket Termination Failure Investigation

    Gregory Harrigan / Azita Valinia / Nathan Trepal et al. | NTRS | 2021


    The Arecibo Observatory-History and Science (Abstract) (AAS 03-256)

    Altschuler, D. R. / American Astronautical Society / American Institute of Aeronautics and Astronautics | British Library Conference Proceedings | 2003


    Prospects for Arecibo Radar Investigation of Mathilde

    Scheeres, D. J. / Ostro, S. J. / Yeomans, D. K. et al. | NTRS | 1997


    Arecibo data reduction

    Thompson, T. W. | NTRS | 1973


    The Surface of Titan: Arecibo Radar Observations

    Campbell, D. B. / Black, G. J. / Carter, L. M. et al. | NTRS | 2002