This report presents findings on the activities conducted in the Traffic Control Device Evaluation Program during the 2017 fiscal year. The research on sponsored changeable message signs (continued from the previous year) was terminated by the Federal Highway Administration. Also continued from the previous year, the update for determining time requirements for traffic signal preemption at highway-railroad grade crossings was completed. New efforts included a focus on wrong-way driving mitigation efforts throughout Texas and a safety evaluation of wet-weather pavement markings in Texas. The final activity was an effort to develop a method to compute roadway grade from streaming data.
Traffic Control Device Evaluation Program: FY 2017
2018
100 pages
Report
Keine Angabe
Englisch
Transportation & Traffic Planning , Transportation , Road Transportation , Highway Engineering , Traffic control devices , Bridges , Detection , Distance , Glare , Retroreflectivity , Rural areas , Simulation , Speed control , Traffic signs , Visibility , Warning signs , Changeable Message Sign (CMS) , Dynamic Message Sign (DMS) , Digital Billboards (DBB) , Wet retroreflectivity , Safety , Pavement markings , Wrong Way Countermeasures , Signal preemption , Highway-railroad grade crossings
Traffic control device, traffic control method, and program
Europäisches Patentamt | 2017
|TRAFFIC CONTROL DEVICE, TRAFFIC CONTROL METHOD, AND TRAFFIC CONTROL PROGRAM
Europäisches Patentamt | 2018
|TRAFFIC JAM EVALUATION METHOD, TRAFFIC JAM EVALUATION DEVICE, AND TRAFFIC JAM EVALUATION PROGRAM
Europäisches Patentamt | 2022
|ON-VEHICLE DEVICE, TRAFFIC CONTROL DEVICE, TRAFFIC CONTROL METHOD, AND TRAFFIC CONTROL PROGRAM
Europäisches Patentamt | 2017
|TRAFFIC CONTROL DEVICE, TRAFFIC CONTROL METHOD, AND PROGRAM
Europäisches Patentamt | 2016
|