The project proposes to construct a portion of a parallel taxiway to serve the main instrument runway at the Municipal Airport. The proposed taxiway improvement is not expected to affect the environmnet of the surrounding area or hinder the ecological balance of Goleta Slough. (Author)
Santa Barbara Municipal Airport, Santa Barbara, California
1971
127 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
Beach Restoration for Santa Barbara
British Library Online Contents | 1997
Engineering Index Backfile | 1946