The Space Station Environmental Control and Life Support System (ECLSS) contract with NASA MSFC covered the time frame from 9 May 1985 to 31 Dec. 1992. The contract roughly covered the period of Space Station Freedom (SSF) development from early Phase B through Phase C/D Critical Design Review (CDR). During this time, McDonnell Douglas Aerospace-Huntsville (formerly McDonnell Douglas Space Systems Company) performed an analytical support role to MSFC for the development of analytical math models and engineering trade studies related to the design of the ECLSS for the SSF.
Space Station ECLSS Integration Analysis
1993
14 pages
Report
Keine Angabe
Englisch
Space Station ECLSS Integration Analysis
NTRS | 1993
Assembly and Integration of the Space Station Freedom ECLSS
SAE Technical Papers | 1992
|G189A Modelling of Space Station Freedom's ECLSS
NTIS | 1991
|Growth evolution of the Space Station ECLSS
AIAA | 1986
|