Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    NASA Experience


    Beteiligte:
    A. Ramos (Autor:in)

    Erscheinungsdatum :

    2011


    Format / Umfang :

    2 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    The NASA Experience

    Ramos, Alberto | NTRS | 2011


    Sharing the NASA Experience

    O. O. Kegege | NTIS | 2018


    Sharing the NASA Experience

    Kegege, Obadiah O. | NTRS | 2018


    NASA INSPIRE Summer STEM Experience

    Thakrar, Prital | NTRS | 2011


    NASA INSPIRE Summer STEM Experience

    P. Thakrar | NTIS | 2011