This project was undertaken to determine the feasibility of gathering vehicle, driver, and carrier data to be used to format and wirelessly transmit from a commercial motor vehicle a Safety Data Message Set (SDMS). The Wireless Roadside Inspection (WRI) Program is defined in three phases: Phase 1: Proof-of-Concept Test (POC)Testing of commercial off-the-shelf technology to validate WRI concept. Phase 2: Pilot TestSafety technology maturation and back-office system integration. Phase 3: Field Operational TestMulti-vehicle testing over a multi-state region This report focuses on Phase 1 efforts. Technical efforts dealt with the ability of a wireless inspection system to collect driver, vehicle, and carrier information; format a SDMS from this information; and wirelessly transmit a SDMS to a roadside receiver unit or mobile enforcement vehicle.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Wireless Roadside Inspection Proof of Concept Test Final Report

    G. L. Capps / O. Franzese / H. E. Knee et al. | NTIS | 2009


    Wireless Roadside Inspection of Commercial Motor Vehicles

    Cherry, Christopher / Bordley, Lawson / Petrolino, Joseph et al. | Transportation Research Record | 2012



    Wireless Roadside Inspection Phase 2 Evaluation Final Report

    C. Cherry / L. Bordley / J. Kelfer et al. | NTIS | 2011