The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops a model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating location of the aircraft. Interviews with C-130 SPO personnel, combined with use of the C-130 Service Life Data Base, provided the required data to develop the C-130 PDM interval model. The C-130 PDM interval model developed in this paper allows maintainers and operators to predict the optimum time between C-130 PDM activities. It eliminates the requirement to base PDM intervals on aircraft MDS. As a result, there is a potential for significant savings by deferring PDM for a portion of the C-130 fleet. Finally, the PDM interval model developed in this paper may be applicable for other DOD aircraft which use aircraft MDS as the determinant of PDM intervals.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    C-130 Programmed Depot Maintenance

    J. A. Daniels | NTIS | 1998



    DETERMINING MAINTENANCE INTERVALS USING COMBINATION OF MODELS

    RANJAN K PAUL / JAN IRVAHN / CHRISTOPHER D DEITS et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    DETERMINING MAINTENANCE INTERVALS USING A COMBINATION OF MODELS

    PAUL RANJAN K / IRVAHN JAN / DEITS CHRISTOPHER D et al. | Europäisches Patentamt | 2024

    Freier Zugriff