Southern Maryland Electric Cooperative, Inc. (“SMECO” or “Cooperative”) is proposing to construct a new 230kV double circuit transmission line from SMECO’s Holland Cliff switching station in northern Calvert County, Maryland to the SMECO Hewitt Road switching station in St. Mary’s County, Maryland. Also proposed as part of this project is the southern Calvert County 230/69kV switching station that would be connected to this line and be located between the Holland Cliff and Hewitt Road switching stations in the vicinity of the existing SMECO Calvert Cliffs 69kV transmission line tap near the intersection of Pardoe Road and Maryland State Route 4. The new 230kV Holland Cliff to Hewitt Road transmission line and associated southern Calvert County 230/69kV switching station is being proposed to meet growth of electrical energy demands and improve system reliability within SMECO’s service area.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Holland Cliff-Hewitt Road 230 kV Transmission Line Project Electric Alternative Evaluation Study


    Erscheinungsdatum :

    2008


    Format / Umfang :

    20 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Hewitt: Hitler's Armada

    Hewitt, Nick | Online Contents | 2009


    The cooper Hewitt lamp

    Engineering Index Backfile | 1901


    The Hewitt-Crocker helicopter

    Crocker, Francis Bacon | Engineering Index Backfile | 1920