A description is given of the role of Lloyd's Register of Shipping as Independent Inspection Agency for the primary circuit of the PWR for the proposed Sizewell B power station. Topics discussed include: Lloyd's Register of Shipping and its functions; the Independent Inspection Agency and its functions; fabrication of the reactor pressure vessel; inspection on site at Sizewell. (Atomindex citation 14:799724)
Sizewell 'B' Power Station Public Inquiry: CEGB Proof of Evidence. Independent Inspection Agency
1982
22 pages
Report
Keine Angabe
Englisch
Sizewell Power Station - cooling water intake
TIBKAT | 1961
|Re-Assessment of Eye Dosimetry in the Cegb
NTIS | 1974
|