As the title states, the report is a summary of the work performed by Raytheon Company under the contract entitled, 'Development of a Merging Control System'. Detailed documentation of the effort are contained in Volumes 1 through 10 of the final report. The summary report, 17 pages in length, presents a brief description and evaluation of the two moving merge control systems, known as the 'pacer' and 'green band' systems, developed as part of the contract. The report also includes a description of the general specification that was developed for an adaptive freeway control system. (BPR abstract)
Merging Control System. Summary
1970
20 pages
Report
Keine Angabe
Englisch
Computer Software , Operations Research , Vehicular traffic control , Transportation models , Freeways , Interchanges , Traffic engineering , Traffic surveys , Systems analysis , Feedback control , Adaptive systems , Comparison , Performance evaluation , Recommendations , Green Band system , Merging control systems , Open loop control systems , Pacer system
ROAD JUNCTION MERGING STRUCTURE AND MERGING CONTROL SYSTEM
Europäisches Patentamt | 2025
|MERGING ASSISTANCE DEVICE, MERGING ASSISTANCE SYSTEM, AND MERGING ASSISTANCE METHOD
Europäisches Patentamt | 2022
|MERGING ASSISTANCE DEVICE, MERGING ASSISTANCE SYSTEM, AND MERGING ASSISTANCE METHOD
Europäisches Patentamt | 2021
|MERGING SUPPORT APPARATUS, MERGING SUPPORT SYSTEM, AND MERGING SUPPORT METHOD
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2017
|