It is proposed to widen an existing road from two to four lanes and adjust alignment at two locations to correct hazardous conditions. The facility increases safety and efficiency of travel between Troy and Piqua, requires additional land for highway purposes, and requires construction of several small bridges over streams flowing into the Miami River.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The Improvement of County Road No. 25A in Miami County, Ohio


    Erscheinungsdatum :

    1973


    Format / Umfang :

    47 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch