This report was prepared by Hughes Associates, Inc. to document the results of fire models for building 221-T Canyon Deck and Railroad Tunnel. Backup data is contained in document No. WHC-SD-CP-ANAL-010, Rev. 0.
Fire modeling for Building 221-T - T Plant Canyon Deck and Railroad Tunnel
1994
121 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1954
|AUTORACK RAILROAD CAR HAVING CONVERTIBLE DECK STRUCTURE
Europäisches Patentamt | 2018
|AUTORACK RAILROAD CAR HAVING CONVERTIBLE DECK STRUCTURE
Europäisches Patentamt | 2023
|Glenwood Canyon Tunnel Aesthetic Design
Transportation Research Record | 1996
|Glenwood Canyon Tunnel Aesthetic Design
Online Contents | 1996
|