The activities and services the prime contractor of the SIRIO-2 program will provide to ensure the required quality of the spacecraft and the relevant equipment during the phases of design and development, manufacturing and tests (including qualification and acceptance), shipping and delivery, and launch preparation, are presented.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Feasibility and Predefinition Study of a Meteorological Data Distribution and LASSO Mission Using a SIRIO Bus, Phase A. Annex 3: Quality Assurance Plan


    Erscheinungsdatum :

    1978


    Format / Umfang :

    103 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch