This thesis focuses on improved aviation readiness and reductions in pipeline investment and repair costs brought about by a power quality management program. Using cost-benefit analysis, it isolates the effects of an implemented program at an Aircraft Intermediate Maintenance Department in order to quantify and compare the costs of implementation and the benefits gained. Specific attention is given to reduction of repair cost of Automatic Test Equipment, and reduction of repair Turn Around Time of repair processes utilizing Automatic Test Equipment. Our analysis identified three-year savings of up to $1,135,134 through the application of a power quality management program at one repair location. The analysis demonstrates the savings achievable from the management of power quality in processes using sensitive electrical equipment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Cost-Benefit Analysis of Power Quality Management in the Avionics Repair Facility


    Beteiligte:
    B. E. Valdyke (Autor:in)

    Erscheinungsdatum :

    1998


    Format / Umfang :

    97 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Advanced Avionics System Analysis. Modular Avionics Cost Benefit Study Formulation

    W. L. Bedzyk / D. R. Czech / T. J. Dickman et al. | NTIS | 1987



    Cost Analysis of Avionics Equipment

    E. N. Dodson / S. F. Kornish / R. R. Liebermann et al. | NTIS | 1974


    Avionics Cost of Ownership

    Hitt | Online Contents | 1997


    Avionics cost of ownership

    Hitt, E.F. | IEEE | 1997