The project involves acquisition of 16.53 acres of land for airport expansion, plus 13.18 acres of easements for clear zones; construction of new N/S runway 60' x 3,000', including MIRL and VASI; construction of stub taxiway and apron; installing rotating beacon; installing windcone and segmented circle; installing protective fencing. There is the possibility of some increase in air pollution in the immediate vicinity of the airport due to anticipated increase in the number of operations by light piston-powered aircraft. Turbine powered aircraft will probably not be using this runway due to its short length. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Medford Municipal Airport, Medford, Oklahoma


    Erscheinungsdatum :

    1972


    Format / Umfang :

    20 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Soil Suction Dispersion and Statistical Analysis with Depth at the Medford Airport

    Nevels, James B. | Transportation Research Record | 1997



    The Medford TWP, New Jersey biodiesel school bus project

    Biluck,J. / Bourbon,A.M. / Medford TWP.Board of Education,US et al. | Kraftfahrwesen | 2002


    The Medford Twp., New Jersey Biodiesel School Bus Project

    Bourbon, Ellen M. / Biluck, Joe | SAE Technical Papers | 2002