To support the mission of the Waste Isolation Pilot Plant (WIPP), the US Department of Energy (DOE) and its management and operating contractor, the Waste Isolation Division (WID) of Westinghouse Electric Corporation, required a transportation system that would meet regulatory requirements and address the issues and concerns of the various stakeholders. The transport system is designed to transport 20,000 or more shipments of contact handled, radioactive, transuranic (TRU) waste over a thirty-five-year period in a safe manner. The DOE and Westinghouse worked closely with the Western Governors' Association (WGA), the Southern States Energy Board (SSEB), the Indian tribes, and outside agencies to identify their concerns on the transport of radioactive material. Using the various inputs, the DOE and Westinghouse built a transportation system that has set standards for the transportation industry. The system incorporates an integrated equipment design, highly qualified drivers, training for emergency response personnel, and testing and evaluation of both equipment and personnel.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    WIPP TRU waste transportation: A circle of safety


    Beteiligte:
    J. J. Winkel (Autor:in) / O. R. Spooner (Autor:in)

    Erscheinungsdatum :

    1996


    Format / Umfang :

    6 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch