Requirements for refurbishing the LANDSAT-D spacecraft after its recovery from orbit at the end of a 3-year mission in order to reuse the spacecraft on a second 3-year mission were studied. A schedule of the time required for the refurbishment including the procurement cycle for long lead-time items is developed. The costs of refurbishing and of procuring an entirely new LANDSAT-D spacecraft are compared.
Landsat-D Refurbishment Study
1980
97 pages
Report
Keine Angabe
Englisch
NTRS | 1980
Emerald Group Publishing | 1999
Online Contents | 1995
Emerald Group Publishing | 1999
REFURBISHMENT - The Bort les Orgues refurbishment scheme in France
Online Contents | 1999
|