Requirements for refurbishing the LANDSAT-D spacecraft after its recovery from orbit at the end of a 3-year mission in order to reuse the spacecraft on a second 3-year mission were studied. A schedule of the time required for the refurbishment including the procurement cycle for long lead-time items is developed. The costs of refurbishing and of procuring an entirely new LANDSAT-D spacecraft are compared.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Landsat-D Refurbishment Study


    Erscheinungsdatum :

    1980


    Format / Umfang :

    97 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Autoclave refurbishment

    Emerald Group Publishing | 1999


    MAINTENANCE & REFURBISHMENT

    Online Contents | 1995


    Concorde refurbishment

    Emerald Group Publishing | 1999