A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling. (Author)
Space Tug Point Design Study. Volume 4: Program Requirements
1973
177 pages
Report
Keine Angabe
Englisch
Space Tug Point Design Study. Volume 1: Summary
NTIS | 1972
Space tug point design study. Volume 1: Summary
NTRS | 1972