During implementation of the National Airspace System En Route Stage A, some Air Route Traffic Control Centers will have complete radar data processing capability while other centers have only flight plan data processing capability. The report describes a digital computer simulation of three versions of a radar beacon code assignment plan designed for this situation. The simulation employs one peak day's IFR traffic in the U.S.A. It determines the number of codes required, the numbers of code changes in flight for various reasons, and the variation of the number of code conflicts with the number of codes used. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Simulation of Air Traffic Control Radar Beacon Code Assignment Plan 3dl


    Beteiligte:
    R. D. Elbourn (Autor:in) / P. B. Saunders (Autor:in)

    Erscheinungsdatum :

    1972


    Format / Umfang :

    62 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Air traffic control radar beacon system

    Crippen, D.S. | Engineering Index Backfile | 1957


    Beacon splits in air traffic control radar beacon system (ATCRBS)

    Murarka, N.P. / Toulios, P.P. / Lanera, D. | Tema Archiv | 1975


    Beacon Splits in Air Traffic Control Radar Beacon System (ATCRBS)

    Murarka, Narayan P. / Toulios, Peter P. / Lanera, Domenico | IEEE | 1975