The stern section of a modern merchant ship, built with machinery and deckhouse aft, is the most labor and capital intensive portion of a ship's construction. This study analyzed the feasibility of standardizing the design and construction of this portion of a ship, for application to a wide variety of merchant ship types, as a means of improving commercial shipbuilding producibility.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Standardized Stern Project. Volume II. Executive Summary


    Beteiligte:
    C. H. Gross (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    10 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Standardized Stern Project. Volume I

    C. H. Gross | NTIS | 1976


    TSM Project Violation Rates: Executive Summary

    J. W. Billheimer / R. Trexler / J. McNally | NTIS | 1981



    GEOS 3. Volume 1: Executive Summary

    T. Kilvington / P. D. Matthews / P. Vangasse et al. | NTIS | 1979