The work performed under this contract consisted of the following; integrate, calibrate, and test, GFE range safety radar tracking beacon and parachute recovery systems; design and develop special devices as required; operate and maintain GFE telemetry station to support telemetry operations at WSMR, New Mexico; and calibrate equipment and perform analyses for air sampling balloon flights conducted at Holloman AFB, New Mexico. (Author)
Sounding Rocket and Balloon Systems Support
1976
8 pages
Report
Keine Angabe
Englisch
Sounding Rocket and Balloon Systems Support
NTIS | 1979
|Swedish Sounding Rocket and Balloon Programme
NTIS | 1991
|Norwegian Sounding Rocket and Balloon Programme
NTIS | 1991
|Esrange: Sounding Rocket and Balloon Facility
NTIS | 1991
|The Norwegian Sounding Rocket and Balloon Program
British Library Conference Proceedings | 2001
|