The results of the analysis conducted on the telemetry data from the prelaunch, launch, and flight activation phases of the ERTS-1 spacecraft are presented. It is presented by sub system sections and provides for inter-relationships as they exist between the several subsystems. A brief statement of subsystem characteristics precedes flight evaluation statements. The appendix contains a total list of components flow on ERTS-1 and a complete listing of commands and telemetry functions for reference. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    ERTS 1 Launch and Flight Activation Evaluation Report, 23 - 26 July 1972. Launch Through Orbit 35 and Orbit Adjust Operation


    Erscheinungsdatum :

    1972


    Format / Umfang :

    272 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch