The objective of this test procedure is to set forth the service test methodology, testing techniques, and minimum test requirements necessary for determining to what degree the missile station, erection, vehicular mounted, performs the mission as prescribed in the Qualitative Materiel Requirements (QMR) and Technical Characteristics (TC), and its suitability for artillery use. (Author)
Missile Station, Erection, Vehicullar Mounted
1968
15 pages
Report
Keine Angabe
Englisch
“HYDRAULICS FOR MISSILE HANDLING AND ERECTION”
SAE Technical Papers | 1959
|Hydraulics for missile handling and erection
Engineering Index Backfile | 1959
|Propulsion Requirements for Space-Station Erection
NTIS | 1959
|The erection of power station switchboards
Engineering Index Backfile | 1897
|