The basic contract to define the system requirements to support the Advanced Extravehicular Activity (EVA) has three phases: EVA in geosynchronous Earth orbit; EVA in lunar base operations; and EVA in manned Mars surface exploration. The three key areas to be addressed in each phase are: environmental/biomedical requirements; crew and mission requirements; and hardware requirements. The structure of the technical tasks closely follows the structure of the Advanced EVA studies for the Space Station completed in 1986.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Extravehicular Activity at Geosynchronous Earth Orbit


    Beteiligte:
    N. Shields (Autor:in) / A. E. Schulze (Autor:in) / G. P. Carr (Autor:in) / W. Pogue (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    238 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Extravehicular activity at geosynchronous earth orbit

    Shields, Nicholas, Jr. / Schulze, Arthur E. / Carr, Gerald P. et al. | NTRS | 1988



    Geosynchronous Earth Orbit Robotic Servicer Mission Design

    Verstraete, Andrew W. / Anderson, Devin / St. Louis, Nicole M. et al. | AIAA | 2018