The report represents the development and findings of a research project. The brief six-month research effort was directed toward several topic areas which included: development of a practical procedure which could be used to fine-tune the offsets of traffic signals to minimize total delay and maximize progression of traffic in a progression system, development of methods that can better estimate delay to travel in a nearly saturated traffic system, and development of methods to estimate fuel consumption associated with arterial travel movements in an urban network. An enhanced version of the popularly used PASSER II program - PASSER II-84, which deals with the design and operation of signalized intersections, was programmed on SDHPT's computer system. Program documentation and revised data coding instructions were also prepared.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Analysis of Reduced-Delay Optimization and Other Enhancements to Passer 2-80 - Passer 2-84. Final Report


    Beteiligte:
    E. C. Chang (Autor:in) / C. J. Messer (Autor:in) / B. G. Marsden (Autor:in)

    Erscheinungsdatum :

    1984


    Format / Umfang :

    129 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Enhancements to Passer V Signal Timing Optimization Program

    C. L. Chu / N. A. Chaudhary / J. D. Johnson et al. | NTIS | 2008


    Enhancements to the PASSER II-90 Delay Estimation Procedures

    Malakapalli, Meher P. | Online Contents | 1993


    Passer IV Quick Response Procedures

    W. D. Cunagin / J. Y. Lee | NTIS | 1985


    Passer la porte, penser la porte

    Klasen, B. / Institut Catholique de Paris / Association Spiritualite et Art | British Library Conference Proceedings | 2004


    Tousles equipements... doivent passer aux essais HT

    British Library Online Contents | 1997