The operational background of the Harrier/AV8 family of aircraft was used to define a demonstrator program for improved performance. The XG15 demonstrator program was completed in April 1988. The results formed the basis of the improved F402-RR-408 engine. The validation test program commenced with an engine roll out in June 1988 and is due for completion in May 1990. A summary of technical issues and program status is given.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Progress in Certifying F402-RR-408: The Improved Pegasus Engine for AV-8B and Harrier 2 Plus


    Beteiligte:
    D. J. Martin (Autor:in)

    Erscheinungsdatum :

    1989


    Format / Umfang :

    10 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch