The proposed project will begin at the east end of the proposed interchange with Interstate 29 and Interstate 129. The project will continue east to an interchange with Lakeport Road in Sioux City. From Lakeport Road the proposed alignment will swing northeasterly crossing Morningside Avenue, and will end at the junction with present U.S. 20. Probable environmental impacts are discussed.
Freeway 520 Sioux City, Woodbury County, Iowa
1972
49 pages
Report
Keine Angabe
Englisch
Highway maintenance organization in Woodbury County, Iowa
Engineering Index Backfile | 1931
|Perry Creek Conduit, Sioux City, Iowa: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1991
|North-South Freeway, City of Dubuque, Iowa
NTIS | 1972
Little Sioux Control Structure, Little Sioux River, Iowa: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1986
|