The study was made to evaluate from an economic and traffic operation standpoint, the effects of installing a barrier median on a moderately traveled arterial street in a medium-sized city. A before, during and after construction, economic analysis of the businesses fronting on the improved roadway is discussed. Comparison is also made with a set of control businesses of the same type as businesses in the study area. Traffic volumes, accidents, irregular vehicle maneuvers, and travel speeds before and after median construction are also reported. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A Median Study in Baytown, Texas


    Beteiligte:
    C. V. Wootan (Autor:in) / H. G. Meuth (Autor:in) / N. J. Rowan (Autor:in) / T. G. Williams (Autor:in)

    Erscheinungsdatum :

    1964


    Format / Umfang :

    34 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    A Median Study in Pleasanton, Texas

    C. V. Wootan / H. G. Meuth / N. J. Rowan et al. | NTIS | 1964


    Evaluation of the Television Surveillance System for the Baytown-Laporte Tunnel

    M. L. Radke / W. R. McCasland / C. Pinnell | NTIS | 1966


    A Median Study in San Antonio, Texas

    C. V. Wootan / H. G. Meuth / N. J. Rowan et al. | NTIS | 1964