The 9 papers in the report deal with the following areas: branchline rail replacement strategies; fatigue analysis of the effects of wheel load on rail life; rail testing: strategies for safe and economical rail quality assurance; production processes to yield superior rail steel; manufacture and properties of deep head hardened rail; in situ rail head rectification on British railways; technical and financial appraisal of a contemporary repair technique for rails and crossings; examination of methods to achieve rail lubrication; report from FAST--recent test experiences.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rail Replacement and Maintenance Management


    Beteiligte:
    D. E. Staplin (Autor:in) / T. R. Wells (Autor:in) / R. K. Steele (Autor:in) / M. W. Joerms (Autor:in) / O. Orringer (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    92 pages



    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Rail replacement and maintenance management

    National Research Council, Committee on Railway Maintenance, USA | TIBKAT | 1988


    Aerial rail transport vehicle and wheel replacement maintenance process

    KE XIAOLE / ZHAO JIAMING / WANG QUANHU et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Rail Wear Inspection Technology for Rail Replacement Forecasting and Rail Maintenance Planning for Heavy Haul Railways

    Magnus, D. L. / International Heavy Haul Association | British Library Conference Proceedings | 1997


    Rail replacement criteria

    Zarembski, Allan M. | IuD Bahn | 1993


    RAIL AND RAIL MAINTENANCE

    Online Contents | 2012