This revision of the Project W-314 Upgrade Scope Summary Report (USSR) represents a refinement of the project scope and supporting justification from which the Conceptual Design Report (CDR) was developed. It defines the actual upgrades and provides traceability to the requirement or driver for the activity.
Tank farm restoration and safe operation, project W-314, upgrade scope summary report
1997
58 pages
Report
Keine Angabe
Englisch
Springer Verlag | 2021
|Springer Verlag | 2023
|