This study, conducted by Wilbur Smith Associates, was funded by the U.S. Trade and Development Agency. The report shows the results of a feasibility study done for the implementation of a high speed rail system linking Bangkok, the Second Bangkok International Airport and the developing cities of the Eastern Seaboard. The report contains the requirements involved in the development of the project including performance specifications, financial considerations, and guidelines for private participation. This is Volume 1 of a 4 partstudy. It contains the Executive Summary and is divided into the following sections: (1) Introduction And Overview; (2) Haui Khwang Land Development; (3) Second Bangkok International Airport; (4) Interdepartmental Coordination; (5) Environmental Impacts; (6) Performance Specifications; (7) Implementing Organization; (8) Financial Considerations; (9) Framework For Private Participation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    High Speed Rail Project: Interconnecting Bangkok and Rayong. Final Report. Volume l. Executive Summary


    Erscheinungsdatum :

    1995


    Format / Umfang :

    76 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch