The report is a supplement to 'Implementation and Operation of a Demand Responsive Public Transportation System (Haddonfield Dial-A-Ride).' The report shows the logic flow of all phases of a manually controlled Dial-A-Ride. The logical design of the Dial-A-Ride Control System is the heart of the system design. From it stem the procedures and training materials. The shorthand notational system employed is presented. Arrow flow diagrams show the time sequence and events in the system. With use of these diagrams, questions of timing, branching to new procedures, flow of documents and information storage can be studied. Personnel and equipment requirements can be determined. Results of time studies made during simulation are presented.
Implementation and Operation of a Demand Responsive Public Transportation System (Haddonfield Dial-A-Ride). Supplement F. Procedure Logic Design
1974
88 pages
Report
Keine Angabe
Englisch