Dredging the Central Basin and Channel A of Port Hueneme Harbor, Ventura County, California to 35 feet is proposed. The ecosystem within the harbor will be temporarily affected by the proposed dredging. Utilization of the increased shipping capacity of the harbor will increase the potential for oil and other waste spillages from vessels.
Port Hueneme Harbor, Ventura County, California
1972
37 pages
Report
Keine Angabe
Englisch
Sand bypassing at Port Hueneme, California
TIBKAT | 1957
|Expansion of Port Hueneme, California: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1975
|Ventura Harbor, California, Design for Wave and Shoaling Protection: Coastal Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1991
|