This document provides the information and procedures required to install a modified Class B riser moor, with sinkers, in the Piscataqua River near the Simplex Cable and Wireless Company, Newington, New Hampshire. The project is referred to as the Simplex Moor. Contained in this document is a description of the moor, the implant schedule, staging and preassembly requirements and the detailed operational scenario. The moor installation is in response to a task initiated by the Naval Electronic Systems Command (NAVELEX). Moor design, acquisition and installation planning is the responsibility of the Chesapeake Division of the Naval Facilities Engineering Command (CHESDIV). The U.S. Coast Guard, First District, has accepted a request from CHESDIV to provide an installation vessel and crew. A brief synopsis of the Simplex Moor participants and their major function is provided.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Simplex Moor Installation Plan


    Beteiligte:
    A. Sutherland (Autor:in) / R. Asher (Autor:in) / L. Mendlow (Autor:in)

    Erscheinungsdatum :

    1978


    Format / Umfang :

    61 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Moor Bridge, Nottingham

    Little, F.M. | Engineering Index Backfile | 1940


    Redevelopment of The Moor

    British Library Online Contents | 2013



    Apparatus for moor floating platform

    Europäisches Patentamt | 2016

    Freier Zugriff

    Deep Sea Ship Moor. Volume 2

    R. L. Webster | NTIS | 1978