The project involves the improvement of SR 395 and ST 17 from Eltopia to Connell. This will be the final link in the improvement of 71 miles of SR 395 between Tri-Cities and Jct. SR 90 at Ritzville. Construction will ultimately consist of a Principal 4-lane divided highway with earth median, 2 interchanges, a rest area, a truck climbing lane and traffic services, such as signing, illumination, guard rail, etc. Right of way acquisition will be complete at a minimum width of 250 feet. First stage construction will consist of a 2-lane undivided highway with grade intersections, rest area, truck climbing lane, and traffic services. The project is entirely in Franklin County, Washington. Environmental impacts are discussed.
SR 395 Eltopia to Connell, Washington
1973
153 pages
Report
Keine Angabe
Englisch
The Connell ferry and Ballachnlish railway
Engineering Index Backfile | 1900
Online Contents | 1998
Online Contents | 1997
Online Contents | 1996
Online Contents | 1996