The Freight Movement and intermodal Access in Kentucky Study (SPR 98-189) is being conducted by the Kentucky Transportation Center on behalf of the Kentucky Transportation Cabinet (KYTC). There are two major objectives of the study: evaluation of the access for trucks between intermodal or other truck generating sites and the National Highway System (NHS); and furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for several facilities located in Henderson County in the Green River Area Development District (ADD) and KYTC Highway District No. 2. The sites to be evaluated were selected from two existing databases (a truck facility survey from 1994 and the intermodal facility inventory) based on ADD and KYTC Highway District planner recommendations, geographic location, distance to the National Highway System, and the number of trucks accessing the site. Consideration was also made for the freight type handled and transportation modes used.
Paradise Power Plant Muhlenberg County Site No. 1113
1998
23 pages
Report
Keine Angabe
Englisch
Transportation , Transportation & Traffic Planning , Road Transportation , Trucking industry , Freight transportation , Routes , Intermodal transportation systems , Kentucky , Transportation corridor accessibility , Evaluation , Accidents , Highway maintenance , Accessibility , Cargo transportation , Highway transportation , Trucks , Data collection , Data analysis , Paradise Power Plant
1113 ships totalling 34914973 tdw on order
Tema Archiv | 1986
Keeping Your Sanity When Using SAE J-1113
SAE Technical Papers | 2000
|An Investigation of Twin Supersonic Jet Coupling (AIAA 2016-1113)
British Library Conference Proceedings | 2016
|Keeping Your Sanity When Using SAE J-1113
British Library Conference Proceedings | 2000
|