The report is a contingency and preconstruction study of the Alyeska Pipeline Service Company on the laying and operating of the pipeline. Included are the following subjects: Pipe; Pump stations; Marine terminal; Pipeline control, Pipeline construction; Maintenance; Oil spills; Permafrost; Thermal erosion; Vegetation and revegetation; Seismic considerations; Scour and hydrology; Thermal pollution; Aufeis; Fish and Wildlife; Air pollution; Noise; Forest Fires; Waste Disposal.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Trans-Alaska Pipeline. Exhibits, Washington, D.C. Volume II


    Erscheinungsdatum :

    1971


    Format / Umfang :

    552 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch