A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    System Cost Performance Analysis (Study 2.3). Volume 1: Executive Summary


    Beteiligte:
    B. H. Campbell (Autor:in)

    Erscheinungsdatum :

    1974


    Format / Umfang :

    34 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch