The Republic of Albania Ministry of Industry and Energy and the Albanian Power Company (KESH) hereinafter known as the 'Owner' is planning to build, own and operate an electrical generating station near Viore, Albania. The Viore Combined Cycle Generating Facility (the 'Facility') will be a combined cycle generation plant within a nominal range of 100 to 135 MW, gross output power block. The plant site is located on a six hectare green tfield site adjacent to the offshore oil tanker terminal located on the Adriatic coast north of the Port of Viore. It is located approximately six km from the Port of Viore and nearest improved road.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Feasibility Study of the Electricity System Interconnection Project in Albania - Final Technical Specifications


    Erscheinungsdatum :

    2004


    Format / Umfang :

    241 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch