The contractor tasks required to produce a shuttle mission simulator for training crew members and ground personnel are discussed. The tasks will consist of the design, development, production, installation, checkout, and field support of a simulator with two separate crew stations. The tasks include the following: (1) review of spacecraft changes and incorporation of appropriate changes in simulator hardware and software design, and (2) the generation of documentation of design, configuration management, and training used by maintenance and instructor personnel after acceptance for each of the crew stations. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Shuttle Mission Simulator Requirements Report, Volume 1, Revision C


    Beteiligte:
    J. F. Burke (Autor:in)

    Erscheinungsdatum :

    1973


    Format / Umfang :

    441 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch