The study surveys the performance, cost, and schedule trade-off process during the ship acquisition cycle, from identification of the need to delivery of the ship. The dialogue between the ship user and the ship producer to develop the ship system requirements and translate the need into a ship which meets the user's requirements is discussed. The survey investigates the trade-off techniques used by many of the individuals within the ship project offices of the Naval Ships Systems Command. As a result of investigating how these individuals attempt to optimize the variables of performance, cost, and schedule, some conclusions are drawn and recommendations made for future consideration in the ship acquisition process.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A Survey of Management Trade-Offs through the Ship Acquisition Life Cycle


    Beteiligte:
    J. J. Negin (Autor:in) / R. E. Wright (Autor:in)

    Erscheinungsdatum :

    1974


    Format / Umfang :

    111 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Helicopter Cooling, Air Cycle/Vapor Cycle Trade-Offs

    Buckingham, R. D. | SAE Technical Papers | 1984


    On-board signal acquisition: system trade-offs and implementation

    Cardarilli, G.C. / Comparini, C. / Re, A.D. et al. | IEEE | 2003



    4.1004 On-Board Signal Acquisition: System Trade-Offs and Implementation

    Institute of Electrical and Electronics Engineers | British Library Conference Proceedings | 2003


    A Method for Economic Trade-Offs of Alternate Ship Structural Materials

    C. R. Jordan / J. B. Montgomery / R. P. Krumpen et al. | NTIS | 1978